Advantages of shell and core
The concept of shell and core (or base build) is that the developer builds the base building (the shell and core), and fit out works are left to be completed by tenants to their own specification before the building is occupied. Shell and core originated in the USA where it was used for office buildings that were built for rent by developers. Rosehaugh/Stanhope introduced a similar idea in the UK in its ground-breaking Broadgate development in the City of London.
For more information see: Shell and core.
There are several advantages to the shell and core method:
- It can speed up the design and build process considerably, which can generate cost savings. It allows progress to be made in the design of portions of the building which will be fitted out later while the items of the shell and core that have a longer lead time (i.e. structures, façade and so on), are being constructed. This allows work to proceed without delays waiting for details of the interiors to be finalised.
- It creates a blank canvas for occupants, making it more flexible, without impacting on the the main fabric of the building.
- It avoids waste as it is less necessary for occupants to strip out existing fittings.
- It can result in more energy-efficient buildings, as the typically concrete core creates a thermal mass that enhances heat storage potential of the building.
- From the perspective of the end user, shell and core is particularly beneficial as it can result in a finish more suited to their needs. The ‘blank canvas’ of the building enables the end user to better align it to their individual requirements and there can be more time to develop proposal.
- The underlying flexibility of the design means it is generally more straight forward for subsequent occupants to change the interior fit out.
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
The importance of early engagement
Construction lessons from the Trillium HealthWorks Experience Centre.
Mayors are to be given planning call in powers
Mayors across England will be able to make the most important planning decisions.
The Master Builder: William Butterfield and his times. Book review.
Why construction can't afford to ignore the skills gap.
Building Safety Regulator, 19 August
Gill Kernick appointed Independent Chair of Residents’ Panel.
Connecting knowledge, technology and conservation
Building competence for the future of built heritage.
Building Regulations and Building Safety Act
CIOB publishes free advice for non-domestic clients.
Building Safety Newsletter from MHCLG.
An extraordinary record of steel engineering worldwide.
Households living near new pylons to save on bills.
ECA warns growth must not outpace grid capacity or skills.
The role of the client and decision making
CIOB response to built environment professions call for evidence.

















